Response supplies may include packaged goods, tools, pumps, generators, barriers, lighting equipment, protective equipment and repair materials. The layout should keep essential items accessible and provide clear routes for receiving and dispatching supplies.
Vehicle support buildings need additional clearance for trucks, utility vehicles, trailers and equipment being loaded or unloaded. Door positions, maneuvering room and the flow of vehicles through the site should be planned to avoid congestion when operations intensify.
Where a site needs multiple functions, separate areas can be planned for supplies, equipment and work activity. Any requirements for power, lighting, communication systems, heating, cooling or sanitation must be included in the project scope rather than assumed to be part of a basic building.